{"id":80647,"date":"2021-03-22T14:41:26","date_gmt":"2021-03-22T06:41:26","guid":{"rendered":"http:\/\/www.eurocharm.com.tw\/topping-out-ceremony-factory-no-6\/"},"modified":"2024-03-11T14:25:12","modified_gmt":"2024-03-11T06:25:12","slug":"topping-out-ceremony-factory-no-6","status":"publish","type":"post","link":"https:\/\/www.eurocharm.com.tw\/en\/topping-out-ceremony-factory-no-6\/","title":{"rendered":"TOPPING OUT CEREMONY FACTORY No. 6"},"content":{"rendered":"<p><a href=\"http:\/\/www.eurocharm.com.tw\/wp-content\/uploads\/2021\/03\/IMG_8877-1.jpg\"><img decoding=\"async\" class=\"alignnone size-full wp-image-80513\" src=\"http:\/\/www.eurocharm.com.tw\/wp-content\/uploads\/2021\/03\/IMG_8877-1.jpg\" alt=\"\" \/><\/a><\/p>\n<p>On the morning of March 16th, 2021, Construction Investment Joint Stock Company No. 18.3 (Licogi18.3) held the topping out ceremony for factory No. 6 in Ba Thien II Industrial Park, Binh Xuyen district, Vinh Phuc province, with the presence of representatives of Contractor, Project Management Board, Supervision Consultant; VPIC1&#8217;s Board of Directors.<br \/>\n<!--more--><br \/>\nThe ceremony marking the construction of factory No. 6 has completed the raw body on schedule.This project is located at Lot C11, C12, Ba Thien II Industrial Park, Thien Ke commune, Binh Xuyen district, Vinh Phuc province with phase I construction area of 7.7 hectares. Total factory area is over 50,000 m\u00b2.<\/p>\n<p><a href=\"http:\/\/www.eurocharm.com.tw\/wp-content\/uploads\/2021\/03\/IMG_8879.jpg\"><img decoding=\"async\" class=\"alignnone size-full wp-image-80331\" src=\"http:\/\/www.eurocharm.com.tw\/wp-content\/uploads\/2021\/03\/IMG_8879.jpg\" alt=\"\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On the morning of March 16th, 2021, Construction Investment Joint Stock Company No. 18.3 (Licogi18.3) held the topping out ceremony for factory No. 6 in Ba Thien II Industrial Park, Binh Xuyen district, Vinh Phuc province, with the presence of representatives of Contractor, Project Management Board, Supervision Consultant; VPIC1&#8217;s Board of Directors.<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[90],"tags":[],"_links":{"self":[{"href":"https:\/\/www.eurocharm.com.tw\/en\/wp-json\/wp\/v2\/posts\/80647"}],"collection":[{"href":"https:\/\/www.eurocharm.com.tw\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eurocharm.com.tw\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eurocharm.com.tw\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eurocharm.com.tw\/en\/wp-json\/wp\/v2\/comments?post=80647"}],"version-history":[{"count":2,"href":"https:\/\/www.eurocharm.com.tw\/en\/wp-json\/wp\/v2\/posts\/80647\/revisions"}],"predecessor-version":[{"id":86213,"href":"https:\/\/www.eurocharm.com.tw\/en\/wp-json\/wp\/v2\/posts\/80647\/revisions\/86213"}],"wp:attachment":[{"href":"https:\/\/www.eurocharm.com.tw\/en\/wp-json\/wp\/v2\/media?parent=80647"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eurocharm.com.tw\/en\/wp-json\/wp\/v2\/categories?post=80647"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eurocharm.com.tw\/en\/wp-json\/wp\/v2\/tags?post=80647"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}