{"id":82011,"date":"2021-10-25T11:09:54","date_gmt":"2021-10-25T03:09:54","guid":{"rendered":"http:\/\/www.eurocharm.com.tw\/esg\/%e4%be%9b%e6%87%89%e9%8f%88%e7%ae%a1%e7%90%86\/%e4%be%9b%e6%87%89%e5%95%86%e8%a9%95%e9%91%91\/%e6%96%b0%e4%be%9b%e6%87%89%e5%95%86%e8%a9%95%e9%91%91\/"},"modified":"2026-04-17T09:42:04","modified_gmt":"2026-04-17T01:42:04","slug":"new-supplier-evaluation","status":"publish","type":"page","link":"https:\/\/www.eurocharm.com.tw\/en\/esg\/supply-chain-management\/supplier-reviews\/new-supplier-evaluation\/","title":{"rendered":"New Supplier Evaluation"},"content":{"rendered":"\n<p class=\"has-very-light-gray-background-color has-background\"><strong>Pre-qualification: <\/strong>We ask the vendors to fill out the \u201cVendor Information Form\u201d for the preliminary qualification review. The staff at purchasing department then make a preliminary assessment of the vendors according to the \u201cVendor Information Form,\u201d including their turnovers, main customer and products, and processing type. If a vendor passes the preliminary review, a field survey would be conducted; if not, its qualification would be cancelled.<\/p>\n\n\n\n<p class=\"has-very-light-gray-background-color has-background\"><strong>Field investigation: <\/strong>The staff from the purchasing department notify the staff from quality assurance, and together they conduct field survey and audit regarding the vendor\u2019s capabilities for manufacturing and quality management capability. The purchasing department fills out the results of the field survey on the \u201cVendor Field Survey Form\u201d and \u201cNew Supplier Audit Form\u201d and submit these documents to the authorized supervisor for review. Once the audit is approved, a \u201cQualified Vendor List\u201d will be established; if not, other potential vendors will be cultivated.<\/p>\n\n\n\n<h4 class=\"wp-block-heading has-text-color has-link-color wp-elements-8666175422fc357116807768c75bbc1b\" style=\"color:#00436a;font-style:normal;font-weight:700\"><strong>New Supplier Rating Level in Taiwan<\/strong><\/h4>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-background\" style=\"background:linear-gradient(135deg,rgb(254,254,254) 0%,rgb(197,224,255) 100%)\"><thead><tr><th><strong>Level<\/strong><\/th><th><strong>Grades Description<\/strong><\/th><\/tr><\/thead><tbody><tr><td>Pass (70 points or above)<\/td><td>Suggestions for improvement are made to the suppliers; regular checks are conducted.<\/td><\/tr><tr><td>Need re-evaluation (50- 70 points)<\/td><td>Suppliers need to propose action plans for improvement; unqualified items are re-audited to ensure that problems are solved.<\/td><\/tr><tr><td>Disqualified (below 50 points)<\/td><td>Suppliers fail to meet the quality requirement and cannot become an official vendor.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h4 class=\"wp-block-heading has-text-color has-link-color wp-elements-cfedf1cf996edc447b39b56ea55f66d7\" style=\"color:#00436a;font-style:normal;font-weight:700\"><strong>Number of New Suppliers Evaluated in Taiwan<\/strong><\/h4>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-background\" style=\"background:linear-gradient(135deg,rgb(253,253,253) 0%,rgb(197,224,255) 100%)\"><thead><tr><th class=\"has-text-align-center\" data-align=\"center\"><strong>Item<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>Unit<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>2023<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>2024<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>2025<\/strong><\/th><\/tr><\/thead><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\">Number of new suppliers evaluated<\/td><td class=\"has-text-align-center\" data-align=\"center\">Number<\/td><td class=\"has-text-align-center\" data-align=\"center\">2<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Scheduled Number of New Suppliers<\/td><td class=\"has-text-align-center\" data-align=\"center\">Number<\/td><td class=\"has-text-align-center\" data-align=\"center\">2<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Ratio<\/td><td class=\"has-text-align-center\" data-align=\"center\">%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h4 class=\"wp-block-heading has-text-color has-link-color wp-elements-63f968c0082fa05fa2b874a7458ac6c5\" style=\"color:#00436a;font-style:normal;font-weight:700\"><strong>Number of New Suppliers Evaluated Based on Environmental and Social Standards in Taiwan<\/strong><\/h4>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-background\" style=\"background:linear-gradient(135deg,rgb(254,254,254) 0%,rgb(197,224,255) 100%)\"><thead><tr><th class=\"has-text-align-center\" data-align=\"center\"><strong>Item<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>Unit<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>2023<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>2024<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>2025<\/strong><\/th><\/tr><\/thead><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\">Number of new suppliers evaluated based on environmental and social standard<\/td><td class=\"has-text-align-center\" data-align=\"center\">Number<\/td><td class=\"has-text-align-center\" data-align=\"center\">2<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Scheduled Number of New Suppliers<\/td><td class=\"has-text-align-center\" data-align=\"center\">Number<\/td><td class=\"has-text-align-center\" data-align=\"center\">2<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Ratio<\/td><td class=\"has-text-align-center\" data-align=\"center\">%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h4 class=\"wp-block-heading has-text-color has-link-color wp-elements-29f62f696a098f7a13cb63ddc832be2c\" style=\"color:#00436a;font-style:normal;font-weight:700\"><strong>Number of New Suppliers Evaluated Level in Taiwan<\/strong><\/h4>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-background\" style=\"background:linear-gradient(135deg,rgb(254,254,254) 0%,rgb(197,224,255) 100%)\"><thead><tr><th class=\"has-text-align-center\" data-align=\"center\"><strong>Item<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>Unit<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>2023<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>2024<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\">2025<\/th><\/tr><\/thead><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\">Qulified<\/td><td class=\"has-text-align-center\" data-align=\"center\">Number<\/td><td class=\"has-text-align-center\" data-align=\"center\">2<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Disqulified<\/td><td class=\"has-text-align-center\" data-align=\"center\">Number<\/td><td class=\"has-text-align-center\" data-align=\"center\">0<\/td><td class=\"has-text-align-center\" data-align=\"center\">0<\/td><td class=\"has-text-align-center\" data-align=\"center\">0<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h4 class=\"wp-block-heading has-text-color has-link-color wp-elements-fa3bbbfffd6820fb0ae4a71a5c860886\" style=\"color:#00436a;font-style:normal;font-weight:700\"><strong>New Supplier Rating Level in Vietnam<\/strong><\/h4>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-background\" style=\"background:linear-gradient(135deg,rgb(253,253,253) 0%,rgb(197,224,255) 100%)\"><thead><tr><th class=\"has-text-align-center\" data-align=\"center\"><strong>Level<\/strong><\/th><th><strong>Pass Rate Grade Range<\/strong><\/th><\/tr><\/thead><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\">A(\u226585%)<\/td><td>The supplier\u2019s system is good and needs to be maintained; the supplier reaches the standard as a supplier in Vietnam.<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">B(70-84%)<\/td><td>The supplier\u2019s system is average and needs to be improved; the supplier reaches the standard as a supplier in Vietnam.<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">C(50-69%)<\/td><td>Improvements are required in six months, and then supplier would be continuously audited; the supplier would be disqualified if it fails to reach the B level.<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">D(&lt;50%)<\/td><td>The supplier\u2019s system is poo; the supplier is removed from the Vietnam system.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h4 class=\"wp-block-heading has-text-color has-link-color wp-elements-94e95fb59d1f59d237818c5ffb315ae7\" style=\"color:#00436a;font-style:normal;font-weight:700\"><strong>Number of New Suppliers Evaluated in Vietnam<\/strong><\/h4>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-background\" style=\"background:linear-gradient(135deg,rgb(253,253,253) 0%,rgb(197,224,255) 100%)\"><thead><tr><th><strong>Item<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>Unit<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>2023<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>2024<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>2025<\/strong><\/th><\/tr><\/thead><tbody><tr><td>Actual number of suppliers evaluated<\/td><td class=\"has-text-align-center\" data-align=\"center\">Number<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">10<\/td><\/tr><tr><td>Planned number of suppliers to be evaluated (monthly plan)<\/td><td class=\"has-text-align-center\" data-align=\"center\">Number<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">10<\/td><\/tr><tr><td>Ratio<\/td><td class=\"has-text-align-center\" data-align=\"center\">%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h4 class=\"wp-block-heading has-text-color has-link-color wp-elements-5a46f4464aa8bae835f434c58b04bb89\" style=\"color:#00436a;font-style:normal;font-weight:700\"><strong>Number of New Suppliers Evaluated Based on Environmental and Social Standards in Vietnam<\/strong><\/h4>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-background\" style=\"background:linear-gradient(135deg,rgb(254,254,254) 0%,rgb(197,224,255) 100%)\"><thead><tr><th class=\"has-text-align-center\" data-align=\"center\"><strong>Item<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>Unit<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>2023<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>2024<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>2025<\/strong><\/th><\/tr><\/thead><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\">Number of new suppliers evaluated based on environmental and social standard<\/td><td class=\"has-text-align-center\" data-align=\"center\">Number<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">10<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Scheduled Number of New Suppliers<\/td><td class=\"has-text-align-center\" data-align=\"center\">Number<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td class=\"has-text-align-center\" data-align=\"center\">10<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Ratio<\/td><td class=\"has-text-align-center\" data-align=\"center\">%<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<\/td><td class=\"has-text-align-center\" data-align=\"center\">100<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h4 class=\"wp-block-heading has-text-color has-link-color wp-elements-bccc6acd6ca2c68bab9a98d1bf1265b9\" style=\"color:#00436a;font-style:normal;font-weight:700\"><strong>Number of New Suppliers Evaluated Level in Vietnam<\/strong><\/h4>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-background\" style=\"background:linear-gradient(135deg,rgb(255,255,254) 2%,rgb(197,224,255) 100%)\"><thead><tr><th class=\"has-text-align-center\" data-align=\"center\"><strong>Level<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>Unit<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>2023<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>2024<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>2025<\/strong><\/th><\/tr><\/thead><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\">A<\/td><td class=\"has-text-align-center\" data-align=\"center\">Number<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">0<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">B<\/td><td class=\"has-text-align-center\" data-align=\"center\">Number<\/td><td class=\"has-text-align-center\" data-align=\"center\">2<\/td><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td class=\"has-text-align-center\" data-align=\"center\">10<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">C<\/td><td class=\"has-text-align-center\" data-align=\"center\">Number<\/td><td class=\"has-text-align-center\" data-align=\"center\">0<\/td><td class=\"has-text-align-center\" data-align=\"center\">0<\/td><td class=\"has-text-align-center\" data-align=\"center\">0<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">D<\/td><td class=\"has-text-align-center\" data-align=\"center\">Number<\/td><td class=\"has-text-align-center\" data-align=\"center\">0<\/td><td class=\"has-text-align-center\" data-align=\"center\">0<\/td><td class=\"has-text-align-center\" data-align=\"center\">0<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Pre-qualification: We ask the vendors to fill out the \u201cVendor Information Form\u201d for the preliminary qualification review. The staff at purchasing department then make a preliminary assessment of the vendors according to the \u201cVendor Information Form,\u201d including their turnovers, main customer and products, and processing type. If a vendor passes the preliminary review, a field [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":75954,"parent":82010,"menu_order":1,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"_links":{"self":[{"href":"https:\/\/www.eurocharm.com.tw\/en\/wp-json\/wp\/v2\/pages\/82011"}],"collection":[{"href":"https:\/\/www.eurocharm.com.tw\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.eurocharm.com.tw\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.eurocharm.com.tw\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eurocharm.com.tw\/en\/wp-json\/wp\/v2\/comments?post=82011"}],"version-history":[{"count":24,"href":"https:\/\/www.eurocharm.com.tw\/en\/wp-json\/wp\/v2\/pages\/82011\/revisions"}],"predecessor-version":[{"id":91680,"href":"https:\/\/www.eurocharm.com.tw\/en\/wp-json\/wp\/v2\/pages\/82011\/revisions\/91680"}],"up":[{"embeddable":true,"href":"https:\/\/www.eurocharm.com.tw\/en\/wp-json\/wp\/v2\/pages\/82010"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eurocharm.com.tw\/en\/wp-json\/wp\/v2\/media\/75954"}],"wp:attachment":[{"href":"https:\/\/www.eurocharm.com.tw\/en\/wp-json\/wp\/v2\/media?parent=82011"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}